Macrame Project Planner (Digital Download)

$14.00

Having a hard time keeping all of your macrame projects and supplies organized? Want to design your own macrame patterns but you aren't sure how to decide on cord lengths?

Check out the Macrame Project Planner! You get BOTH versions in one download: the printable planner and the interactive tablet version. Print it, use it on your iPad, or do both. Your call.

Pages include:

  • Macrame Project Planner Page
  • Layered Wall Hanging Planner Page
  • Panel Wall Hanging Planner Page
  • Semicircle Wall Hanger Planner Page
  • Mandala Wall Hanger Planner Page
  • Plant Hanger Planner Page
  • Finished Macrame Pattern Pages
  • Cord Inventory
  • Daily Planner
  • Projects this Year
  • Grid Pages to Design Macrame Projects
  • Mandala Design Pages with Circular Grids
  • Cord Length Estimation Chart w/ Instructions
  • Cord Size Change Estimation Chart w/ Instructions
  • Knot Measurements Chart w/ Instructions
  • & More!

TWO WAYS TO USE IT:

Printable version: 41 pages in three sizes, 8.5" x 11" (letter sized), A4 and A5. Designed to print easily on regular paper with your home printer, so you can print just the pages you need, as many times as you want.

Digital version: an interactive PDF made for a tablet and stylus (like an iPad and Apple Pencil) in a notation app such as GoodNotes or Noteshelf. Same planner, nothing to print. Tablet, stylus and app not included.

The planner includes a chart to help you estimate cord lengths when designing your own macrame patterns, and another chart to help you adjust your cord lengths if you want to use a different size cord!

These charts alone will help you out a ton when you want to create your own patterns and need to estimate cord amounts. Game changer!

Start creating your own amazing macrame patterns for wall hangings, plant hangers and more!

**This is a PDF Download. It is an INSTANT DOWNLOAD, you will receive a PDF PLANNER ONLY and NOT a physical item. Nothing physical will be mailed to you.

**Non-refundable due to the digital nature of this product.**